News

最新消息


2016年01月5日

Huisman holds steel cutting ceremony for COOEC’s 325mt VLS

On Monday 21 December, Huisman, the worldwide specialist in lifting, drilling and subsea solutions, held a steel cutting ceremony together with COOEC, a subsidiary of CNOOC, for their new pipelay system at the Huisman facility in China. It is a 325mt Vertical Lay System for flexible pipe. It will be the first Vertical Lay System ever operated and owned by a Chinese company. The tower will be installed onboard of the offshore construction vessel HYSY286, and together with the earlier supplied 400mt deep water mast crane of Huisman, this vessel will become a very efficient and capable deep water construction vessel.


2015年11月26日

Tidal Power Plant in Dutch Eastern Scheldt storm surge barrier put into service


2015年09月25日

Tocardo and Huisman install Tidal Power Plant in Dutch Eastern Scheldt storm surge barrier


2015年09月23日

Huisman celebrates the delivery of the 100th Huisman China built crane


2015年09月17日

Huisman's Hybrid Boom Crane nominated for the Maritime Innovations Award 2015


更多新闻

即将举行的活动


未找到符合条件的信息 更多