Huisman Equipment
  • Markets
    Offshore Wind
    Offshore Wind
    Oil and Gas
    Oil and Gas
    Geothermal Energy
    Geothermal Energy
    Civil Works
    Civil Works
    Port Logistics
    Port Logistics
    Leisure
    Leisure
    Contact
    Sales
  • Products
    Cranes
    Cranes
    Pipelay
    Pipelay
    Renewables Solutions
    Renewables Solutions
    Drilling
    Drilling
    Offshore Wind
    Offshore Wind
    Heave Compensation
    Heave Compensation
    Winches
    Rentals and retrofits
    References
    Brochures
    Contact
    Sales
  • Services
    myHuisman©
    myHuisman©
    Training Programmes
    Training Programmes
    Upgrades and Modifications
    Upgrades and Modifications
    Parts Delivery and Advice
    Parts Delivery and Advice
    On-site Support
    On-site Support
    Remote Assist
    Remote Assist
    Whenever and wherever
    you need us
    Service agreement
    Brochures
    Contact
    Services
    Emergency telephone
    +31 88 070 26 22
  • Careers
    Working at Huisman
    Working at Huisman
    New Perspectives
    New Perspectives
    View our vacancies
    View our vacancies
    Contact
    Recruitment
  • News and downloads
    Brochures
    Brochures
    Product sheets
    Product sheets
    News
    News
    Articles
    Articles
    Subscribe
    to our newsletter
  • About Huisman
    Company Profile
    Company Profile
    QESH
    QESH
    Mission, vision and values
    Mission, vision and values
    Terms and conditions
    Terms and conditions
    Huisman worldwide
    Huisman worldwide
    Contact us
    Contact us
Login My Huisman
  • contact
  • Translate
    Google Translate English 中文
/ Home Media Centre News Successful first project for Huisman’s new LOC 400 Drilling Rig
share this page
Facebook Twitter LinkedIn Mail Print Link
Copy link
/ Press release

Successful first project for Huisman’s new LOC 400 Drilling Rig

June 05, 2009

Huisman's newly developed containerised drilling rig, the LOC 400, operated by the Northern Dutch Drilling Company (NDDC) for Northern Petroleum Netherlands (NPN), successfully completed its first well in Werkendam, The Netherlands. The recently delivered unit managed to drill the entire well (TD = 2,650m (8,694ft) from spud to rig release in a period of 6 weeks, with very little downtime. This is a remarkable performance considering the completely new rig design and the new drilling contractor. In addition, the 780m (2,559ft) surface hole was completed using casing while drilling techniques, which is an absolute first for the Netherlands, the depth of the surface hole by Casing While Drilling is a new record for Europe.

Successful first project for Huisman’s new LOC 400 Drilling Rig

Huisman's newly developed containerised drilling rig, the LOC 400, operated by the Northern Dutch Drilling Company (NDDC) for Northern Petroleum Netherlands (NPN), successfully completed its first well in Werkendam, The Netherlands. The recently delivered unit managed to drill the entire well (TD = 2,650m (8,694ft) from spud to rig release in a period of 6 weeks, with very little downtime. This is a remarkable performance considering the completely new rig design and the new drilling contractor. In addition, the 780m (2,559ft) surface hole was completed using casing while drilling techniques, which is an absolute first for the Netherlands, the depth of the surface hole by Casing While Drilling is a new record for Europe.

 

Besides the surface hole, the project scope comprised two additional well sections: section 2 with a target depth of 2,100m (6,890ft) and section 3 with a final depth of 2,650m (8,694ft). Both sections were smoothly completed using drill pipe and a steerable BHA with mud motor. After this first project, the easy-to-move rig will be transported with regular container trucks to the north of the Netherlands to start its next project.

 

In 2005, Dutch-based worldwide specialist in lifting, drilling and subsea solutions Huisman, introduced the LOC 250, a fully containerised super single drilling rig for on- and offshore use, currently operating in the US and Mexico. Building on this experience Huisman developed and constructed the LOC 400. The drilling process does not require personnel on the rig floor for both casing while drilling and conventional drilling, which enhances safety for the rig personnel. The pipe handling and making of connections can be controlled from the driller's cabin.

 

The pipe handler can manage pipes without risk of damage to thread, enabling the protectors to be removed and the pipe to be doped while on the horizontal pipe rack, just 1.5m (4,9ft) above the ground. The top drive, stabbing arm and power tong make connections easy, safe, fast and reliable. For casing while drilling, the top drive and power slips can make and break connections, while the make-up is also monitored closely including torque graph recordings.

 

The LOC 400 has a very small footprint and is easy-to-transport as 27 ISO containers, guaranteeing fast, safe and therefore cost effective rig moves. The total number of personnel required to operate the rig is four.

 

Currently, another three LOC 400 units are under construction at the Huisman facility in the Czech Republic.

Huisman Equipment
/ Terms
Privacy policy
Cookie statement
Disclaimer
Responsible disclosure
/ contact
Head office
Sales
Service Sales
Recruitment
/ follow Huisman
Copyright 2026 © Huisman Equipment B.V.