/ Press release

Huisman designs and builds a new reeled rigid pipelay system for Subsea7

15 November 2005

Huisman designs and builds a new reeled rigid pipelay system for Subsea7. The main scope is: 300mt Reel-lay System, upgradable to 400mt. 3500mt main reel (28m diameter, 10m tussen de flenzen) 400mt OMC met active heave compensation piggy back reel 80T CT Winch 400mt Traction winch + Storage winch.
 

Huisman designs and builds a new reeled rigid pipelay system for Subsea7
Increase workability
Motion Compensated Platform
Huisman introduces:
Motion Compensated Platform
Find out more