Huisman Equipment
  • Markets
    Offshore Wind
    Offshore Wind
    Oil and Gas
    Oil and Gas
    Geothermal Energy
    Geothermal Energy
    Civil Works
    Civil Works
    Port Logistics
    Port Logistics
    Leisure
    Leisure
    Contact
    Sales
  • Products
    Cranes
    Cranes
    Pipelay
    Pipelay
    Renewables Solutions
    Renewables Solutions
    Drilling
    Drilling
    Offshore Wind
    Offshore Wind
    Heave Compensation
    Heave Compensation
    Winches
    Rentals and retrofits
    References
    Brochures
    Contact
    Sales
  • Services
    myHuisman©
    myHuisman©
    Training Programmes
    Training Programmes
    Upgrades and Modifications
    Upgrades and Modifications
    Parts Delivery and Advice
    Parts Delivery and Advice
    On-site Support
    On-site Support
    Remote Assist
    Remote Assist
    Whenever and wherever
    you need us
    Service agreement
    Brochures
    Contact
    Services
    Emergency telephone
    +31 88 070 26 22
  • Careers
    Working at Huisman
    Working at Huisman
    New Perspectives
    New Perspectives
    View our vacancies
    View our vacancies
    Contact
    Recruitment
  • News and downloads
    Brochures
    Brochures
    Product sheets
    Product sheets
    News
    News
    Articles
    Articles
    Subscribe
    to our newsletter
  • About Huisman
    Company Profile
    Company Profile
    QESH
    QESH
    Mission, vision and values
    Mission, vision and values
    Terms and conditions
    Terms and conditions
    Huisman worldwide
    Huisman worldwide
    Contact us
    Contact us
Login My Huisman
  • contact
  • Translate
    Google Translate English 中文
/ Home Media Centre News Huisman signs contract with Shanghai Xiongcheng to deliver a 3,000 tonne pile winder crane
share this page
Facebook Twitter LinkedIn Mail Print Link
Copy link
/ Press release

Huisman signs contract with Shanghai Xiongcheng to deliver a 3,000 tonne pile winder crane

August 30, 2021

Huisman, a worldwide provider of innovative technology solutions, has signed a contract with Shanghai Xiongcheng Offshore Engineering Co. The crane will be installed on its new generation of self-lifting and self-propelled offshore wind installation vessels.

Huisman signs contract with Shanghai Xiongcheng to deliver a 3,000 tonne pile winder crane

The wind power installation vessel is equipped with Huisman 3000 tonne pile winding crane after completion will become one of the most advanced offshore wind power installation vessels in China and the world. Throughout the global offshore wind power industry, offshore wind turbines are constantly updated and iterated, their size and deadweight are getting bigger and bigger, the requirements for installation vessels are getting higher and higher, and the existing offshore installation vessels in the market are facing more and more difficulties when installing this type of wind turbine. Huisman's pile-wrap cranes are unique in many aspects such as lifting capacity and lifting height, enabling the safe and efficient installation of the latest generation of offshore wind turbines. The crane is equipped with a double main hook configuration, which allows for the turning of monopiles or duct racks without the need for additional equipment, greatly enhancing the efficiency of offshore wind installations.

 

Ltd. is a professional service provider engaged in offshore wind power, cross-sea bridges, and offshore oil platform foundation construction, has participated in a number of cross-sea bridges, offshore wind power and other key projects, which is the advantage of the above areas of enterprise. The choice to cooperate with Huisman again fully reflects the trust in Huisman, and once again proves that Huisman pile-winding cranes are highly recognized and favoured by the Chinese offshore wind power market.

 

Zhang Tie, Chairman of Shanghai Xiongcheng, said: We are currently using five Huisman cranes, amazed at the powerful function and reliability of Huisman cranes, bringing great value to our offshore engineering operations. Therefore, our company for China's offshore wind power 14th Five-Year Plan, the 15th Five-Year Plan to build a new generation of offshore wind power integrated ships will still use Huisman's high-end cranes. We hope that in 2023 Huisman will deliver a perfect 3,000-tonne crane to complement our new generation of wind turbine installation vessels, making it a dream vessel, a leading vessel and an epoch-making vessel!

 

David Roodenburg, Chief Executive Officer of Huisman, said: "With this order for a pile-winding crane, we are proud to support the important contribution that Shanghai Xiongcheng is making to the development of offshore wind power in China. We are very grateful to our client for the trust they have placed in us by choosing a Huisman crane equipped with a unique double main hook hoisting function that allows for the efficient turning of monopiles. Our team is committed to delivering this crane to the highest quality standards to ensure it can operate safely, efficiently and economically in offshore wind farms.

 

Features and benefits of the Huisman pile winding crane:  

  • Fully electric drive system for high precision positioning, low maintenance costs and greater reliability.
  • Self-developed slewing bearing system for highly accurate positioning of the crane and improved reliability.
  • Unique double main hook lifting system for easy turning of the wind turbine foundation.
  • Low tail swing for optimal use of deck space.
Huisman Equipment
/ Terms
Privacy policy
Cookie statement
Disclaimer
Responsible disclosure
/ contact
Head office
Sales
Service Sales
Recruitment
/ follow Huisman
Copyright 2026 © Huisman Equipment B.V.