Huisman Equipment
  • Markets
    Offshore Wind
    Offshore Wind
    Oil and Gas
    Oil and Gas
    Geothermal Energy
    Geothermal Energy
    Civil Works
    Civil Works
    Port Logistics
    Port Logistics
    Leisure
    Leisure
    Contact
    Sales
  • Products
    Cranes
    Cranes
    Pipelay
    Pipelay
    Renewables Solutions
    Renewables Solutions
    Drilling
    Drilling
    Offshore Wind
    Offshore Wind
    Heave Compensation
    Heave Compensation
    Winches
    Rentals and retrofits
    References
    Brochures
    Contact
    Sales
  • Services
    myHuisman©
    myHuisman©
    Training Programmes
    Training Programmes
    Upgrades and Modifications
    Upgrades and Modifications
    Parts Delivery and Advice
    Parts Delivery and Advice
    On-site Support
    On-site Support
    Remote Assist
    Remote Assist
    Whenever and wherever
    you need us
    Service agreement
    Brochures
    Contact
    Services
    Emergency telephone
    +31 88 070 26 22
  • Careers
    Working at Huisman
    Working at Huisman
    New Perspectives
    New Perspectives
    View our vacancies
    View our vacancies
    Contact
    Recruitment
  • News and downloads
    Brochures
    Brochures
    Product sheets
    Product sheets
    News
    News
    Articles
    Articles
    Subscribe
    to our newsletter
  • About Huisman
    Company Profile
    Company Profile
    QESH
    QESH
    Mission, vision and values
    Mission, vision and values
    Terms and conditions
    Terms and conditions
    Huisman worldwide
    Huisman worldwide
    Contact us
    Contact us
Login My Huisman
  • contact
  • Translate
    Google Translate English 中文
/ Home Media Centre News New order for Huisman’s dedicated wind turbine installation crane
share this page
Facebook Twitter LinkedIn Mail Print Link
Copy link
/ Press release

New order for Huisman’s dedicated wind turbine installation crane

March 31, 2010

Huisman, the Dutch-based specialist in lifting, drilling and subsea solutions, has secured a new contract with Centrica and MPI Offshore Limited to supply and install a new, state-of-the-art 600mt Wind Turbine Installation Crane onboard the Wind Turbine Installation Vessel “MPI Resolution”. The crane will be constructed, installed, commissioned and tested at the Huisman facility in Schiedam, The Netherlands.

New order for Huisman’s dedicated wind turbine installation crane

The Wind Turbine Installation Crane is custom-designed for the installation of offshore wind turbines and derives from Huisman’s many years of experience in the design, fabrication and service of heavy lifting equipment. A combination of superior technical features, such as a low overall crane construction weight (580mt), reduced minimum radius operating ability (12.5m) and minor tail swing, delivery of the new crane within a very tight schedule and installation at Huisman’s ideally situated Schiedam facility convinced CREL and MPI Offshore Ltd to choose Huisman.

 

The new crane will replace the existing 300mt main crane onboard MPI Offshore Limited vessel to prepare it for larger wind turbine component handling requirements for long term vessel charterer Centrica Renewable Energy Ltd (CREL). In the first quarter of 2011, the upgraded vessel is scheduled to be deployed for turbine installation operation upon CREL’s forthcoming 270MW Lyncs wind farm project situated off the UK’s Lincolnshire coast.

Huisman Equipment
/ Terms
Privacy policy
Cookie statement
Disclaimer
Responsible disclosure
/ contact
Head office
Sales
Service Sales
Recruitment
/ follow Huisman
Copyright 2026 © Huisman Equipment B.V.