Huisman Equipment
  • Markets
    Offshore Wind
    Offshore Wind
    Oil and Gas
    Oil and Gas
    Geothermal Energy
    Geothermal Energy
    Civil Works
    Civil Works
    Port Logistics
    Port Logistics
    Leisure
    Leisure
    Contact
    Sales
  • Products
    Cranes
    Cranes
    Pipelay
    Pipelay
    Renewables Solutions
    Renewables Solutions
    Drilling
    Drilling
    Offshore Wind
    Offshore Wind
    Heave Compensation
    Heave Compensation
    Winches
    Rentals and retrofits
    References
    Brochures
    Contact
    Sales
  • Services
    myHuisman©
    myHuisman©
    Training Programmes
    Training Programmes
    Upgrades and Modifications
    Upgrades and Modifications
    Parts Delivery and Advice
    Parts Delivery and Advice
    On-site Support
    On-site Support
    Remote Assist
    Remote Assist
    Whenever and wherever
    you need us
    Service agreement
    Brochures
    Contact
    Services
    Emergency telephone
    +31 88 070 26 22
  • Careers
    Working at Huisman
    Working at Huisman
    New Perspectives
    New Perspectives
    View our vacancies
    View our vacancies
    Contact
    Recruitment
  • News and downloads
    Brochures
    Brochures
    Product sheets
    Product sheets
    News
    News
    Articles
    Articles
    Subscribe
    to our newsletter
  • About Huisman
    Company Profile
    Company Profile
    QESH
    QESH
    Mission, vision and values
    Mission, vision and values
    Terms and conditions
    Terms and conditions
    Huisman worldwide
    Huisman worldwide
    Contact us
    Contact us
Login My Huisman
  • contact
  • Translate
    Google Translate English 中文
/ Home Media Centre News Bully I makes debut in GOM
share this page
Facebook Twitter LinkedIn Mail Print Link
Copy link
/ Press release

Bully I makes debut in GOM

December 08, 2011

Shell and Noble Corp. announced the Gulf of Mexico arrival of the Noble Bully I, a state-of-the-art offshore drilling rig that is designed to raise the bar in terms of safety and performance. The Noble Bully I is the first of two Bully rigs, jointly designed by Shell and Noble, and can be equipped to drill in up to 10,000-feet of water

Bully I makes debut in GOM

The Bully rigs also feature a Huisman designed and built compact box-type drilling tower, known as a Multi-purpose Tower, instead of a conventional derrick. As the name indicates, a Multi-purpose Tower is designed to maximize productivity and safety, yet it allows for a significantly smaller vessel when compared to other deep water drill ships of similar capacity.

 

The ships also feature an attention to energy efficiency, use less fuel and are shorter and lighter than comparable drill ships. The Noble Bully I and Noble Bully II are dynamically positioned drill ships and can, therefore, be positioned at a favorable angle toward wind, waves, and currents, and feature ice-class hulls. Shell and Noble have increased the automated technology on the Bully rigs, increasing personnel safety on board.

 

The Noble Bully I has now arrived in the Gulf of Mexico from Singapore and will complete commissioning and acceptance testing this month before beginning operations. The Noble Bully I will first drill in Shell's Mars B, Olympus, development while the Noble Bully II drill ship is expected to begin operations early next year in Brazil.

Huisman Equipment
/ Terms
Privacy policy
Cookie statement
Disclaimer
Responsible disclosure
/ contact
Head office
Sales
Service Sales
Recruitment
/ follow Huisman
Copyright 2026 © Huisman Equipment B.V.